What Is a Data Center Park? (2026 Guide)

What Is a Data Center Park? Quick Answer

A data center park is a dedicated campus where several data center buildings, or units, share land, power, water and fiber infrastructure built by a park developer. Most Indian state policies define a park by minimum capacity, usually 20–25 MW, and give park developers separate incentives such as interest subsidies, land subsidies and support for dual-grid power.

How a Data Center Park Works

A park developer prepares the shared infrastructure: land, roads, water and sewage, power substations and feeders, and fiber connectivity. Data center operators or cloud companies then build or lease individual units inside the park. Shared infrastructure lowers each unit’s cost and can shorten time-to-power, because the grid connection is planned once for the whole campus.

How Indian States Define Data Center Parks

StateDefinition or provisionPolicy
HaryanaAt least 20 MW of data center power on at least 20 acresHaryana State Data Center Policy 2022
JharkhandAt least 25 MW, housing at least 5 data center unitsIT, Data Center and BPO Investment Promotion Policy 2023
RajasthanGreenfield data center industrial park of at least 20 MW cumulative capacityRajasthan Data Centre Policy 2025
Tamil NaduMinimum eligible fixed assets of ₹500 crore for the park; units inside need not meet this individuallyTamil Nadu Data Centre Policy 2021
Uttar Pradesh60% interest subsidy up to ₹50 crore per park; one grid connection reimbursed for the first eight parksUttar Pradesh Data Centre Policy 2026
MaharashtraMIDC land earmarked for data center parks; free MIDC land and stamp duty waiver for the first three integrated green parksIT & ITeS Policy 2023; October 2024 GR
KarnatakaPlanned parks at Hoskote, Mangaluru and MysuruSustainable Data Centre Policy 2026–31 (cabinet-approved)

Full details and official documents are in the State policy guide.

Why Data Center Parks Matter

Parks let states plan power, water and fiber once for a whole cluster rather than project by project. For operators, they mean shared costs, faster approvals and, where policies allow, sub-leasing of land or buildings to data center units. For AI campuses, the key question is whether the park’s power capacity and redundancy match the density planned for it. Talk to Techno Digital.

Related Guides

FAQs

What is a data center park?

A campus where several data center units share land, power, water and fiber infrastructure built by a park developer.

How big is a data center park in India?

State policies usually set a minimum of 20–25 MW of capacity; Haryana also requires at least 20 acres.

What is the difference between a data center park and a data center unit?

A unit is one facility. A park is the campus that hosts several units and their shared infrastructure.

Which states offer incentives for data center parks?

Uttar Pradesh, Jharkhand, Haryana, Rajasthan, Tamil Nadu, Maharashtra and Karnataka all have park-specific provisions.

Can data center parks sub-lease land to operators?

Some policies allow it. Tamil Nadu’s 2021 policy permitted sub-leasing to data center units without transfer charges on state-allotted land.