Neocloud Infrastructure in India

Neocloud Infrastructure in India

Why India? The Economics That Change AI Infrastructure

India Vs Global Markets: The Data Center advantage

Category
Market Size
Power Cost(per KWh)
OPEX Efficiency
CAPEX Advantage
Policy and Incentives
Times to Deploy
India (Growth Hotspot)
1B+ internet users; DC capacity projected to scale 5X by 2030
Structurally lower through renewable PPAs and state-level incentives
Up to 30-40% lower driven by renewable PPAs and state concessions
40–50% lower build costs enabled by modular construction and execution efficiencies
Infrastructure status, long-term tax incentives, and data localization driving in-country deployment
Faster execution cycles supported by integrated power and infrastructure delivery
Other Markets (Established Regions)
Mature demand with slower growth and saturation in core regions
Higher and volatile energy costs impacting long-term AI economics
Rising operating costs driven by energy, land, and regulatory overheads
High labour, material, and permitting costs increasing build complexity
Limited, fragmented incentives with slower regulatory alignment
Multi-year timelines driven by approvals, grid access, and supply constraints
Techno Digital – Your India Infrastructure Partner

We don’t just offer rack space. We enable infrastructure that scales built on power, connectivity, and execution.

Techno Digital is the digital infrastructure arm of Techno Electric & Engineering Company Ltd. (TEECL), a publicly listed, debt-free company with 40-year legacy in building India’s most critical power systems.

Flexible Deployment Models – Built Around Your Strategy
Model
Colocation
Infrastructure-as-a-Service (IaaS)
Build-to-Suit
Edge Partnership
Joint GTM
Best For
Enterprises testing India demand with 1–10 MW initial deployment
Rapid GPU deployment without CAPEX
Enterprises scaling to 10-100+ MW with custom needs
Enterprises expanding inference-at-edge and distributed workloads
Enterprises offering managed AI compute to Indian enterprises
What You Get
GPU-ready infrastructure with power, cooling and connectivity.
Bare metal compute with Pay-as-you-go model
Purpose-built data center designed to your specs, delivered on Techno Digital’s EPC backbone in 12–18 months
Access to nationwide edge network with RailTel fiber backbone and low latency
Bare metal + private cloud infrastructure
From Colocation to Custom Campuses – Scale on Your Terms
Hyperscale Colocation – GPU-Ready from Day One

Live Data Center

Chennai Data Center (Live – 36 MW)
Rated 3 facility designed for high-density AI & HPC workloads

Upcoming Data Centers

Noida (18 MW) – Launching 2026 (Northern India)
Kolkata (13 MW) – Launching 2027 (Eastern India)

Build-to-Suit – Designed for Your AI Scale

Our Build-to-Suit model delivers end-to-end facility development tailored to your exact specifications

  • Custom facilities from 5 MW to 100+ MW tailored for GPU density and cooling.
  • In-house EPC capabilities covering electrical, mechanical, civil, and structural engineering.
  • 15–20% lower construction costs vs third-party contractors.
  • Site selection support across India’s Tier-1 and Tier-2 cities with pre-negotiated land and power agreements
  • Accelerated delivery timelines: concept to commissioning in 12–18 months.
India’s Largest Edge Network

102 Edge Data Centers. 23 States. One Connected Fabric

In partnership with RailTel Corporation of India Ltd. (Government of India PSU), Techno Digital is building one of the most extensive edge infrastructures globally.

Total Facilities

102 Edge Data Centers across 23 Indian states

Total Capacity

200 MW aggregate capacity

Design Standard

Tier III design standards

Fiber Backbone

63,000+ km fiber (RailTel’s OPGW network)

Target Latency

Sub-5ms to metro; sub-10ms to Tier-2/Tier 3
Let's Build the Future of AI Compute in India together
Whether you’re an enterprise planning your first India deployment or scaling an existing presence, Techno Digital offers the infrastructure, power expertise, and partnership flexibility to accelerate your growth.